Permitting Process

🛠️ PERMITTING PROCESS

📌 What permits are required to install a mobile home?

The first step is to review the zoning classification of the plot according to the Local Building Regulations (HÉSZ). This determines what type and size of structure can legally be placed on the land.

The building must also comply with:

  • the National Building Code (OTÉK)

  • the Townscape Design Manual (TAK)

If the mobile home is to be registered as a permanent residential building, a building permit is required.



⚙️ What utility connection permits are required?

Electricity:

Connection must be requested from the local electricity provider. A licensed electrician must submit the required technical plans.

Water and sewage:

Connections must be approved by the local water utility.
If there is no public sewage system, a licensed wastewater treatment unit (e.g. biological treatment plant) must be installed.

Gas (if applicable):

Separate plans and a certified gas technician are required.



🧾 When is an occupancy permit and address registration needed?

If the building is intended for permanent residence and utilities are connected, an occupancy permit is mandatory.

After that, the following can be requested:

  • Official address registration at the local municipality

  • Land registry entry, if the building is to be classified as a permanent property



🏗️ Can a mobile home be installed without a permit?

Yes, in certain cases:

  • If the unit is a wheeled structure (like a tiny house) and is not permanently affixed to a foundation, it is usually classified as a vehicle or transport unit, not a building.

  • Temporary structures (e.g. site cabins) may be allowed for up to 180 days with separate authorization.

  • If the mobile home is under 35 m² and not intended for permanent living, it may fall under notification-only procedures, without a full building permit.

⚠️ It is strongly recommended to consult with the local building authority about the specific requirements for your property.



🌍 Where can you legally install a mobile home in Hungary?

  • Outlying plots (rural areas): more flexible regulations, but limited utility access

  • In-town plots: stricter building rules, but better infrastructure and address registration options

  • Residential zones are best for permanent living

  • Holiday zones are usually suitable for seasonal use — some municipalities may allow permanent use, but it must be verified in advance



⏳ How long does the permitting process take?

Permit type Estimated timeframe
Notification-based building permit 15–30 days
Full building permit 30–60 days (+ possible corrections)
Occupancy permit 30–60 days
Utility connections (water, electricity, gas) 15–90 days
Land zoning change (e.g. holiday → residential) 3–12 months


💰 What costs should be considered?

Official fees:

  • Building permit, occupancy permit

  • Utility connection fees

  • Land reclassification or subdivision fees

Expert services:

  • Architectural and structural plans

  • Technical supervisor (if required)

  • Energy performance certificate

Utility infrastructure:

  • Electricity, water, sewage, gas

  • If no utilities: well drilling, water tanks, biological wastewater treatment, etc.



🏡 What is the difference between a registered residential property and a mobile structure?

Feature Registered residential property Mobile home (as a movable unit)
Parcel number Yes No
Land registry entry Registerable Generally not
Official address Possible Rarely possible
Utility access Full Limited or alternative
Eligibility for support & loans Yes Usually not


📝 Can I register a permanent address in a mobile home?

Only if the home is:

  • officially registered in the land registry as a building,

  • has an occupancy permit,

  • and is fully connected to utilities.

In holiday zones, registration is typically limited to temporary residence, not permanent address.